Home · Services · Full Home Renovation

Service

Full Home Renovation

A single crew for the full dwelling — floor plans, bones, services, and surfaces — run on one timetable with one answerable lead.

A Fresh House, No Move Needed

A full overhaul rethinks daily flow: partitions shift, kitchens join sitting rooms, old baths turn restful, and worn services get swapped. We order each stage so you can remain at home as it changes — or step away briefly for top speed.

  • Floor-plan shifts, partition removal & structural tasks
  • Kitchen, baths & utility in a single scheme
  • Wiring, pipework & heating renewals, permissions sorted
  • Floors, paint & trim across every room
  • A named site lead & daily photo notes
Open-plan living areas after a full home renovation

Process

From First Visit to Final Welcome

STEP 01

Measure & Sketch

We survey, check services, and draw the fresh layout with 3D previews for sign-off.

STEP 02

Set Offer

One set sum, staged calendar, and samples fixed before strip-out.

STEP 03

Staged Build

Room-at-a-time graft with dust care, so the rest stays liveable.

STEP 04

Sign-off Tour

Snag-list tour, thorough clean, and a written 2-year craft cover.

Renovated classic living room with new lighting New kitchen installed during a full home renovation

Common Questions

How long does a whole-house job run?

Most full-dwelling jobs span 3–6 months by scale and structural load. Your written calendar maps each stage before we lift a tool.

Can we stay put while you work?

Generally yes — we stage by zones and keep key rooms going. If a brief move buys real speed, we flag it early.

Are permissions and checks covered?

Yes. Structural, wiring, pipework, and heating permissions plus every check sit with our team.

Does the price truly stay put?

Yes. The signed sum stands; only brief changes you ask for move it, priced on paper before extra graft starts.

Ready to Reimagine Your Space?

Arrange a free full-house review and receive a set plan inside days.

Start Your Project