Downstairs, Done Properly
Basements fail when moisture is ignored. We start with waterproofing and drainage, then add insulation, heating, and daylight-mimicking light — so the result is a genuine living space, not a dressed-up cellar.
- Damp-proofing, sump pumps & drainage
- Insulation, heating & ventilation
- Spare bedrooms, baths & kitchenettes
- Cinema corners, gyms & home offices
- Egress windows & code compliance handled
Process
Dry First, Pretty After
STEP 01
Dry Survey
Moisture readings and drainage checks decide the waterproofing spec.
STEP 02
Tank & Insulate
Membranes, pumps, and insulation lock warmth in and water out.
STEP 03
Fit-Out
Stud walls, electrics, plumbing, and finishes — typically 6–10 weeks.
STEP 04
Sign-Off
Inspections passed and certificates filed before you move in.
Common Questions
Will my basement stay dry?
Yes — every conversion gets a designed waterproofing system with pumps and alarms where needed, backed by a written guarantee.
Do I need permits?
Most habitable conversions need building approval, especially with bedrooms or baths. We prepare drawings and manage the paperwork.
How much headroom is needed?
Around 7 feet finished is the comfort line. Where slabs must drop or ceilings lift, we price the digging openly at survey.
Can a basement hold a bathroom?
Absolutely — macerators or ejector pumps connect below-grade baths to existing soil lines with no fuss.
Sitting on Spare Square Footage?
Free basement survey with damp readings and a clear conversion plan.
Start Your Project